Frequently asked questions

Questions before
you arrange an assessment.

Understand the work, information and decisions involved in a structural assessment. Property-specific advice requires an agreed professional scope.

Useful answers

Structural inspection and reporting questions

What does a structural engineering inspection examine?

It examines accessible structural conditions in relation to an agreed concern, such as cracking, distortion, uneven floors or damage to load-bearing elements. The proposal should identify the areas, measurements and advice included. It is separate from a general building and pest inspection or a statutory permit inspection.

Do cracks mean that a house has a structural problem?

Crack width or appearance alone cannot establish that. The location, pattern, building construction, history and associated evidence matter. An assessment explains what the observations support and whether monitoring or further investigation is needed.

Does a floor-level survey explain why a building moved?

A survey records relative levels at selected points. Its interpretation needs the building form, construction history and other evidence. One set of readings does not independently establish the cause, date or continuing activity of movement.

Will I receive a written report?

Confirm the deliverable before booking. Verbal advice, a short written assessment and a detailed causation report involve different work. Explain whether the document is for your own planning, a builder, an insurer, a purchase or a proceeding.

What affects the fee?

Building size, the question to resolve, safe access, document review, measurements, reporting and specialist investigations affect the scope. Ask for a proposal identifying inclusions, exclusions and any separate testing or design fees.

How long will the work take?

Availability, access, evidence volume, testing and reporting requirements determine the programme. Provide your deadline when enquiring. A booking date and report date must be agreed for the particular engagement.

What should I provide before an assessment?

Send available plans, previous reports and original dated photographs when requested. Explain when the concern appeared, whether it changed and what repairs were made. You do not need to diagnose the problem before making an enquiry.

Should I repair cracks before an inspection?

Where practical, record the condition before cosmetic repairs conceal it. Immediate safety work may still be necessary. Ask how investigation and urgent work should be coordinated rather than assuming patching addresses the underlying mechanism.

Are soil testing, leak testing and opening-up included?

Only where expressly included. Those investigations may require specialist contractors, permissions, service-location information and separate fees. The assessment should explain why further evidence is needed.

Can an engineering report decide an insurance claim?

It can provide technical findings on condition, causation or repair requirements. The relevant decision-maker determines policy coverage, claim entitlement and legal responsibility; these are outside an engineering opinion.

Does assessment include repair drawings and construction inspections?

Not automatically. Repair design, technical work scopes, permit interfaces and nominated construction inspections are separate services that should be identified in the engagement.

Does a suburb page confirm that there is an office there?

No. Suburb guides help prepare a property enquiry. They do not represent branch offices or establish local ground conditions, service availability or a history of projects. Confirm coverage for the particular address.

Need a different answer?

Describe the concern and the decision ahead. We can then discuss which service information is relevant and what needs to be confirmed before work starts.