Foundation movement assessment
A foundation movement assessment considers the building and its supporting ground together. It uses the pattern of cracking, distortion, relative levels and relevant history to investigate movement and decide what further evidence or action is justified.
Discuss this assessmentWhen it may help
- Uneven floors occur with cracks, gaps or distorted openings.
- A property has been described as experiencing settlement, subsidence or slab movement.
- You are considering underpinning or restumping and need the concern assessed first.
- An earlier report identifies possible footing movement but leaves the cause unresolved.
What you receive
- A documented description of the movement evidence considered.
- Floor-level results or other measurements if commissioned.
- An explanation of the findings, possible mechanisms and remaining uncertainty.
- Recommendations for the next investigation or action, with written reporting as agreed.
Before booking, confirm whether the engagement includes verbal advice, a written report or a purpose-specific investigation. The proposal should identify the deliverable, intended use and fee.
What can be included
- 01
Review the movement history, construction information and available soil or footing reports.
- 02
Inspect accessible evidence in the building, visible slab edges, piers or subfloor where relevant and safely accessible.
- 03
Consider associated drainage, moisture, vegetation or alterations without assuming they are the cause.
- 04
Measure relative floor levels if required and agreed.
- 05
Assess plausible explanations and the limitations of the evidence.
- 06
Recommend monitoring, leak testing, geotechnical work or a separate remedial-design scope where justified.
How to prepare
- Provide the original soil report, footing/slab drawings and earlier engineering or level-survey reports if available.
- Describe changes over time and any leaks, drainage work, landscaping or alterations.
- Confirm subfloor access and any restrictions around slab edges, boundaries or adjoining property.
Cost and timing
The quote depends on access, building form, the area to be surveyed, available records, reporting needs and any specialist investigations. Separate testing and remedial design should be identified rather than assumed to be included.
The initial assessment may lead to further investigation or monitoring. Ask which stages can be completed for your deadline and which conclusions require more evidence.
What this assessment does not establish
Differences in floor level can reflect original construction, later movement or both. Ground conditions vary within a suburb and across individual sites. A visual assessment may need geotechnical information, repeat measurements or other specialist evidence before a cause or repair is established.
Outside this assessment
- Soil classification or footing design inferred from the suburb.
- Excavation, boreholes or underground-service investigations unless separately arranged.
- A presumption that underpinning or restumping is required.
- A definitive statement that movement is active or historic without sufficient evidence.
Foundation movement assessment questions
Do uneven floors mean the foundations have failed?
Not necessarily. Relative levels need to be considered with the building form, construction tolerances, history and other evidence. A level survey describes the floor; interpreting its cause is a separate engineering task.
Should I arrange underpinning before an assessment?
A repair should respond to an established problem and an appropriate design. An assessment can help identify what information is needed before committing to a proposed footing repair.
Can drainage or leaking pipes affect movement?
Changes in ground moisture can be relevant to some movement mechanisms. The circumstances need investigation; a drainage observation does not prove a particular leak or cause.
Is soil testing included?
Not unless the proposal includes it. Geotechnical investigations, boreholes and laboratory testing are specialist work that may be recommended and quoted separately.
What have you noticed?
Tell us the suburb, the concern and the decision you need to make. The appropriate scope and reporting can then be discussed.